Conduit buried, piping ready for pad, ground is leveled for concrete. Need electrician to finish his stuff up for inspection and we lay concrete. The retaining wall stone was delivered too. We are in the home stretch!
We have the pump pad, electrical, retaining wall and concrete to finish. Almost there....
Designing a big pergola for the back of the house for some shade. I'll
try and post a pic of the design tomorrow.
We finalized locations for the ladder, pump and eelectrical wires. We
are planning on building two 10' square pergolas down at the far end
of the pool. We will be installing ceiling fans in them and one will
be set up for a tv. I may just move into my backyard shortly!